Cost Cutter Fitness Remanufacturing Checklist

Remanufacturing checklist: 

 

Upright & Recumbent Stationary Bikes:

  • Machines run through a full diagnosis
  • Machine is stripped down to bare frame
  • Frame is sandblasted to remove old paint
  • Frame is powder coated with new paint
  • Handrails and other applicable parts are sandblasted and powder coated
  • New bearings are installed
  • New drive belts are installed
  • New cranks are installed
  • New pedals and straps are installed
  • New bushings are installed
  • Machine is run through full diagnosis test
  • Computer console/overlay is rebuilt or replaced
  • Shroud is repainted or replaced
  • Alternators are rebuilt or replaced
  • New decals are applied all around the unit
  • Heart rate grips are replaced
  • Thorough testing through all programs
  • Final product is tested thoroughly through all programs and manual modes
  • Final re-manufactured product is blessed by our certified quality control team

 

Stair Steppers:

  • Machine is stripped down to bare frame
  • Frame is sandblasted to remove old paint
  • Frame is powder coated with new paint
  • Handrails and other applicable parts are sandblasted and powder coated
  • New bearings are installed
  • New drive belt is installed
  • New chain and cable are installed
  • New pedals are installed
  • New bushings are installed
  • Machine is run through a full diagnosis test
  • Computer console/overlay is rebuilt or replaced
  • Shroud(s) are repainted or replaced
  • Alternators are  rebuilt or replaced
  • New decals are applied all around
  • Heart rate grips are replaced
  • Thorough testing through all programs
  • Final product is tested thoroughly through all programs and manual modes
  • Final re-manufactured product is blessed by our certified quality control team

 

 

Treadmills:

  • Machine is stripped down to bare frame
  • Frame is sandblasted to remove old paint
  • Frame is power coated with new paint
  • Handrails and other applicable parts are sandblasted and powder coated
  • New bearings are installed
  • New motor drive belt is installed
  • New idler pulleys are installed
  • Motor is re-built or replaced
  • Rollers are rebuilt with new bearings or replaced
  • Electronics are thoroughly diagnosed, repaired or replaced
  • Machine is run through full diagnosis
  • Computer console and overlay are replaced
  • Motor shroud is repainted or replaced
  • New running deck is replaced
  • New decals are applied all around
  • Thorough testing through all programs
  • Final product is tested thoroughly through all programs and manual modes
  • Final re-manufactured product is blessed by our certified quality control team

 

Ellipticals / Cross-Trainers:

  • Machine is stripped down to bare frame
  • Frame is sandblasted to remove old paint
  • Frame is powder coated with new paint
  • Handrails and other applicable parts are sandblasted and powder coated
  • New bearings are installed
  • New drive belt is installed
  • Elevation motor is rebuilt or replaced
  • Elevation brackets are rebuilt or replaced
  • New ramp covers are installed
  • New wheels and wheel bearings are installed
  • New bushings are installed
  • Electronics thoroughly diagnosed and repaired or replaced
  • Machines are run through full diagnosis
  • Shroud(s) are replaced or repainted
  • New handrail grips are installed
  • Alternators are rebuilt or replaced
  • New decals are applied all around
  • Thorough testing through all programs
  • Final product is tested thoroughly through all programs and manual modes
  • Final re-manufactured product is blessed by our certified quality control team

 

Strength Equipment:

  • Machine is stripped down to bare frame
  • Frame is sandblasted to remove old paint
  • Frame is powder coated with new paint
  • New grips are installed
  • New cables and belts are installed
  • New pulleys are installed
  • Bearings are replaced
  • Upholstery is redone (new foam and backboard)
  • Final re-manufactured product is blessed by our certified quality control team